Alta velocidad Madrid–Andalucía cortada (accidente de Urda) Vía cortada entre Mora/Orgaz y Urda desde el 28/10/2026. Renfe ofrece trenes especiales con transbordo y tramos en autobús; Iryo y Ouigo han cancelado su servicio en el corredor. Sin fecha de reapertura. More information ↗
How it usually runs
Over the last 5 trips measured by Trenalia, this train ran on average 3.8 min late (each trip’s maximum, 5 min on average).
67 %of stops with 5 minutes delay or lessIrregular
5.1 minaverage delay
0 minmedian
+17 minworst delay
Average delay per day
23/10today
How delays are spread
On time (5 min or less)66.7 % (6)
Slight (6–15 min)22.2 % (2)
Moderate (16–30 min)11.1 % (1)
Severe (31–60 min)0 % (0)
Very severe (over 1 h)0 % (0)
Delay at each stop over the last 30 days Trenalia saw this train running, from public Renfe data. It is what happened, not a prediction.
Times and positions are estimates made with public data from Renfe, Adif and the operators’ official timetables: they may be late or wrong. Trenalia is independent and not affiliated with Renfe or Adif: check with your operator before you travel.